ETH Cargo handled the entire logistics project for the Punta Lima Wind Turbine Farm. A total of 13 wind turbine generators would be placed. ETH Cargo was fully involved and dedicated in the offloading of two vessels with all three tower sections, nacelles, hubs and blades. Some of the components, nacelles weighing over 60 tons and blades measuring 40 meters long proved to be a challenge. However, with the expertise, ETH Cargo was able to contract the necessary equipment for the offloading and delivery; some of the equipment not even available in Puerto Rico. All cargo was stored at a designated staging area at the port until pieces were ready to be received as requested by the customer. A dedicated team worked 6 days a week, sometimes into the night for over 4 months to closely monitor the arrival and offloading of all pieces. In the end, all 13 Wind Turbine Generators were successfully delivered, offloaded and installed with little delay.